Sea World Master Plan

7 Documents in Project

Summary

SCH Number
1984030708
Lead Agency
City of San Diego
Document Title
Sea World Master Plan
Document Type
NOD - Notice of Determination
Received
Posted
7/13/2001
Present Land Use
Theme Park/Unzoned/Regional Park
Document Description
Sea World Master Plan Update, Mission Bay Park Master Plan Update and Local Coastal Program Land Use Plan Amendment, and General Plan Amendment to allow an increase of the height limit on the existing 189.4 acre Sea World leasehold from 30 feet to a maximum of 160 feet, in order to implement the approved Sea World Initiative, Proposition D. The Sea World Master Plan Update proposes locations within the theme park area where taller structures could be developed with exhibits, rides or shows as well as an extensive renovation of the front gate area. One particular area is designated for development as a "Splash-Down" ride. Other structures within the Sea World leasehold but outside the theme park proposed to exceed 30 feet in height would include a hotel, an Educational Facility, the Special Events Center expansion, and a parking structure. The project also proposes expansion of the Sea World Marina (formerly "Perez Cove" Marina) and would allow for additional future redevelopment throughout the leasehold. The project site is located in Sea World.

Contact Information

Name
Martha Blake
Agency Name
City of San Diego
Contact Types
Lead/Public Agency

Location

Cities
Mission Beach, Pacific Beach
Counties
San Diego
Cross Streets
Ingraham Street/Sea World Drive
Total Acres
189.4
State Highways
I-5/I-8
Waterways
San Diego River
Other Location Info
Mission Beach and Pacific Beach

Notice of Determination

Approving Agency
M. Blake
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.