Devil's Slide Bypass Project

9 Documents in Project

Summary

SCH Number
1983051706
Lead Agency
California Department of Transportation, Headquarters
Document Title
Devil's Slide Bypass Project
Document Type
NOD - Notice of Determination
Received
Posted
4/30/2004
Present Land Use
State Highway / Open Space / Agricultural
Document Description
The project is the construction of a new section of State Highway 1 between Rockaway Beach in Pacifica and Montara in San Mateo County. The new roadway will consist of twin bridges and a 1,219-meter long twin bore tunnel through San Pedro Mountain. The portions of the project which will require a 1602 Agreement include the placement of pier foundations in an unnamed intermittent drainage at the base of the North portal, grading (i.e. sediment removal) of the north pond on Shamrock Ranch, reconstruction a portion of the earthen dam at the south pond on Sherman Ranch, the excavation in an unnamed drainage at the South portal to blend with the natural environment, and wetland creation (mitigation) in a drainage basin of two drainages at the Charthouse mitigation site.

Contact Information

Name
Jeffrey Jensen
Agency Name
State of California Department of Transportation
Contact Types
Lead/Public Agency

Location

Cities
Half Moon Bay, Pacifica
Counties
San Mateo
State Highways
1
Airports
HALF MOON BAY
Other Location Info
BTWN HALF MOON BAY AIRPORT & LINDA MAR BLVD

Notice of Determination

Approving Agency
CA Dept. of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.