SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2023040719,"Santa Clara, City of",City of Santa Clara,,Kifer Receiving Station BESS Project,MND,4/27/2023,,"SVP is proposing the Kifer Receiving Station (KRS) Battery Energy Storage System (BESS) Project (Project or proposed Project), which would construct a BESS on 1.2 acres to the west of the existing Kifer Receiving Station, in the City of Santa Clara. The site is accessed from Raymond Street. The site is not accessible from any other roads and is surrounded by existing low intensity office and light industrial land uses. The Project would construct and operate a 50-megawatt (MW) BESS, with a four-hour duration, which would be interconnected to SVP’s Kenneth (KEN) Substation, via a new SVP-owned 60 kilovolt (kV) interconnection to the existing KEN-OKJ 60 kV line. The BESS would provide SVP with additional local area capacity for electrical system reliability and flexibility. The site currently has an existing building on it, which will be demolished as part of the Project. The site will be paved with an aggregate base. Construction is estimated to begin in December 2023, and would take approximately 16 months.",https://ceqanet.opr.ca.gov/2023040719,Kifer Receiving Station BESS Project,Sachin Bajracharya,City of Santa Clara ,Project Manager,sbajracharya@santaclaraca.gov,881 Martin Ave,,Santa Clara,CA,95050,4086156617,37°22'33"N 121°57'7"W,Santa Clara,Santa Clara,,Raymond Street and Space Park Drive,95054,1.2,224-08-085,,,Norman Y. Mineta San Jose Intern,No,,,Power,Use Permit,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wildfire",4/27/2023,5/17/2023,,,,,,,,,,,,,,,