SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2023040005,"Regional Water Quality Control Board, Region 5 - Fresno","California Regional Water Quality Control Board, Central Valley Fresno Region 5 ",RWQCB,BIG CREEK POWERHOUSE NO. 1 CULVERT REPLACEMENT PROJECT,NOE,4/3/2023,4/3/2023,"The 0.062-acre Project consists of repair and replacement of the existing culvert so it can convey flows through the drainage channel. The Project is necessary to avoid further erosion and potential damage to the existing road, which provides the sole access to BC Powerhouse No. 1",https://ceqanet.opr.ca.gov/2023040005,BIG CREEK POWERHOUSE NO. 1 CULVERT REPLACEMENT PROJECT,Brandon Salazar,"Regional Water Quality Control Board, Central Valley Region",Water Resource Control Engineer,brandon.salazar@waterboards.ca.gov,1685 E St,,Fresno,CA,93706,5594456278,37°12'14.3"N 119°14'27.6"W,,Fresno,Fresno,,,,,,,,,,,,,,,,Categorical Exemption,15301,The project is replacing an existing culvert with a similar structure that is up to date with modern design standards.,,,,,,,,,,,,