SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2023020282,"Salinas, City of",City of Salinas,,John Street and Abbott Street Mixed Use Development Project ,MND,2/10/2023,,"The John Street & Abbott Street Mixed Use Development Project would facilitate mixed use development on a 22.74-acre site located southeast of the John Street and Abbott Street intersection. The project would involve construction of a 70,000 square-foot hotel with 111 guest rooms, 242 residential units for 232,800 square feet of residential uses, 107,900 square feet of retail use, and 30,900 square feet of office use for a total of 478,800 square feet of new development. The project would be constructed in seven phases occur over 9 to 10 years. The 14 parcels that make up the project site would be reconfigured into 9 parcels. Construction of the hotel would occur in the first phase. Future development in remaining phases would include multi-story mixed-use buildings, retail and office buildings, and multi-family residential buildings. The project would also include upsizing of the adjacent sewer line beneath Abbott Street to provide increased capacity to the project site. Environmental impacts of this project have been analyzed in accordance with the California Environmental Quality Act (CEQA) and a Mitigated Negative Declaration (MND) has been prepared for the project. Based on the environmental document, the project will not have a significant effect on the environment. ",https://ceqanet.opr.ca.gov/2023020282,John Street and Abbott Street Mixed Use Development Project ,Robert Latino,City of Salinas,Associate Planner,robertl@ci.salinas.ca.us,65 w alisal st,,salinas,CA,93901,8317587206,36°24'34.9"N 121°23'5"W,Salinas,Monterey,,John Street and Abbott Street; Abbott Street and Spicer Street,93901,22.74,multiple,"101, 183, 68",Alisal Creek,None,No,2/10/2023,3/13/2023,"Commercial, Office, Residential","Planned Unit Development, Use Permit","Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire",2/9/2023,3/13/2023,,,,,,,,,,,,,,,