SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2023010567,San Mateo County,,,New AT&T cell facility,MND,1/27/2023,,"Coastal Development Permit, Resource Management-Coastal Zone Permit, Use Permit, Design Review, and Grading Permit to construct a new 75-foot tall monopole with nine (9) antennas at the top of the pole, on a parcel developed with a water tank that is owned by Montara Water and Sanitary District. The facility will consist of one 75-foot tall monopole to be erected on a new 441 sq. ft. concrete pad. The equipment area will include a diesel generator, battery back-up unit, plant rack, hvac and global positioning system (gps), and will be enclosed by an 8-ft. tall chain link fence with privacy slats. The proposed facility will be accessed by an existing 12-foot wide gravel road which will require grading to locate telco underground within the road. The cellular facility electrical power will come from a nearby existing electrical vault. The facility will require minor trenching to install and connect to underground telco power within the Alta Vista Road right-of-way. The grading work proposed is 646 cubic yards (c.y.), 343 c.y. of cut and 303 c.y. of fill). The cellular facility equipment area will be located approximately 13 feet north of the existing Montara Water and Sanitary District water tank. ",https://ceqanet.opr.ca.gov/2023010567,New AT&T cell facility,Olivia Boo,San Mateo County ,Planner,oboo@smcgov.org,"455 County Center, 2nd Floor, ",,Redwood City ,CA,94063,6503631818,,Half Moon Bay,San Mateo,,Vallecitos Road,94037,11 acres,036-180-030,Highway 1 (Cabrillo Highway),,Half Moon Bay Airport,No,,,Other,"Coastal Permit, Use Permit","Aesthetics, Air Quality, Cultural Resources, Drainage/Absorption, Geology/Soils, Hydrology/Water Quality, Tribal Cultural Resources",1/25/2023,2/13/2023,,,,,,,,,,,,,,,