SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2023010001,"Fish and Wildlife, Region 2 - Northern Central, Rancho Cordova","California Department of Fish and Wildlife, North Central Region 2",CDFW,Elk Grove Bridge Bore (Streambed Alteration Agreement EPIMS Notification No. SAC- 34984-R2,NOE,1/3/2023,1/3/2023,"The project is limited to the installation of 2-inch conduit using horizontal direction drilling (HDD). The cable will be installed underground under a watercourse crossing. The cable installation will occur at a depth of approximately 10 feet below the surface level elevation the crossing. The entry and receiving pits for the boring operations, as well as all equipment and staging areas, will be located outside of watercourse in upland areas. No equipment or materials will need to enter any watercourse channels and the project will not result in any ground disturbance within any stream/drainage channels. Project equipment generally includes standard HDD equipment, such as a mini excavator to dig the bore pits and a ditch witch vac truck JT-25 to conduct boring as well as hand crews.",https://ceqanet.opr.ca.gov/2023010001,Elk Grove Bridge Bore (Streambed Alteration Agreement EPIMS Notification No. SAC- 34984-R2,Dylan Wood,California Department of Fish and Wildlife,Environmental Scientist,dylan.a.wood@wildlife.ca.gov,1701 Nimbus Road,,Rancho Cordova,CA,95670,9163582384,38°14'35.4"N 121°13'27.5"W,Elk Grove,Sacramento,Sacramento,south side of Elk Grove Boulevard and east of Emerald Oak Drive,,,125-0040-005-0000,,,,,,,,,,,,Categorical Exemption,"Type – Class (4); California Code of Regulations, title 14, sections (15304)","Class 4 because the project involves only a minor alteration to the condition of land and does not include the removal of any mature, healthy, or scenic trees.",,,,,,,,,,,,