SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022120662,Sacramento County,,,US Foods -- American Natural Gas Project,MND,12/28/2022,,"The project consists of the following entitlement requests: • A Zoning Ordinance Amendment to change the subject parcel’s McClellan Park Special Planning Area (SPA) sub-district from Bell Avenue Industrial Office Park to Light Industrial. • A Use Permit for a Compressed Natural Gas (CNG) fueling station with a roof structure height of three feet in the Light Industrial sub-district of the McClellan Park SPA. • A Design Review to comply with the Countywide Design Guidelines. If approved, American Natural Gas (ANG) would build a compressed natural gas (CNG) fueling station in McClellan Business Park. The CNG fueling station scope includes the following: The fueling station will consist of a canopy, three fast-fill dual hose dispensers, a compressor compound, and twelve, 20-foot long above ground storage vessels. The fast-fill station would require the extension of an existing PG&E gas line located beneath Winters Street approximately 250 feet to the west. The depth of the gas line would be three feet. With the exception of the fueling area, the station equipment will be enclosed within chainlink, security fencing, with a Knox gated access system. The project also includes a time fill fueling facility for US Foods’ existing fleet of trucks. The time-fill fuel facility would be located approximately 760 feet to the southwest of the CNG station. The time-fill posts will run north to south, west of the distribution center. The compressor and fast-fill station will be located on the northeast corner of the property. The fast-fill equipment would have an above-ground connection to the existing gas line beneath the area and would not require ground disturbance or subsurface work. The natural gas supply would be sourced from local anaerobic manure digesters. The digester facilities have existing contracts with the California Air Resource Board (CARB) and PG&E in order to reduce methane emissions from livestock operations.",https://ceqanet.opr.ca.gov/2022120662,US Foods -- American Natural Gas Project,Joelle Inman,Sacramento County Planning,ENVIRONMENTAL COORDINATOR,inmanj@saccounty.net,827 7th street,ste 225,sacramento,CA,95814,9168747575,,Sacramento,Sacramento,,,,,215-0340-063-0000,,,,Yes,12/28/2022,1/26/2023,Industrial,Use Permit,"Air Quality, Cultural Resources, Hydrology/Water Quality, Land Use/Planning, Noise, Tribal Cultural Resources",12/28/2022,1/26/2023,,,,,,,,,,,,,,,