SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022110527,"Caltrans, District 6 - Fresno/Bakersfield","California Department of Transportation, District 6",DOT,Cutler-Orosi SR 63 Corridor Enhancement Project (06-1E800),NOE,11/22/2022,11/22/2022,"This Clean California Project enhancing the State Route (SR) 63 from PM 21.72 to PM 22.58 in Cutler and from PM 22.85 to PM R24.35 in Orosi in Tulare County. Work will include; Enhance and beautify the SR 63 corridor in the towns of Cutler and Orosi; Construction of quick painted build bulb-outs along the SR 63 corridor; Install rectangular rapid flashing beacons at marked crosswalks; Develop safe bike lanes to promote active transportation by application of Slurry seal and road diet; Incorporate streetscape elements such as benches, trash receptacles, bike racks, bus stop furnishings; Accent paving in sidewalks at spot locations of interest; Add free standing art and/or a gateway monument at community entryways and along the corridor. All work is within the existing right-of-way.",https://ceqanet.opr.ca.gov/2022110527,Cutler-Orosi SR 63 Corridor Enhancement Project (06-1E800),Trais Norris,Caltrans - District 6,Senior Environmental Planner,trais.norris@dot.ca.gov,"2015 E. Shields Avenue, Suite 100",,Fresno,CA,93726,2096013521,,,Tulare,,SR 63 through Cuttler and Orosi ,,,,63,,,,,,,,,,,Categorical Exemption,Class 1(c),The project is exempt because it will only enhance the community with improvements that will not have a significant impact on the environment. All work is within the State ROW. Measures will be in place to minimize any potential impacts. ,,,,,,,,,,,,