SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022110472,"Regional Water Quality Control Board, Region 5 - Fresno","California Regional Water Quality Control Board, Central Valley Fresno Region 5 ",RWQCB,Lake McClure Raw Water Intake Pump Station,NOE,11/21/2022,11/21/2022,"The project would remove, replace, and upgrade the existing pump station components, including the existing 420 linear feet of pipeline, existing pump facilities, check and gate valves, pipe fittings, and electrical controls for the system. Two high-strength, low-alloy steel pipes, each 12 inches in diameter, would be installed, extending into the lake to a depth of 540 feet amsl",https://ceqanet.opr.ca.gov/2022110472,Lake McClure Raw Water Intake Pump Station,Brandon Salazar,"Regional Water Quality Control Board, Central Valley Region ",Water Resource Control Engineer,brandon.salazar@waterboards.ca.gov,1685 E St,,Fresno,CA,93706,5594456278,37°39'5"N 120°17'24.4"W,,Mariposa,Mariposa,,,,,,Lake McClure,,,,,,,,,,Emergency Project,Sec. 21080(b)(4),The project is related to the ongoing drought emergency in California. The project is needed to ensure a permanent water supply for the Lake Don Pedo Community Services District in light of falling water surface levels in Lake McClure.,,,,,,,,,,,,