SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022110374,Lake County,,,Sherman Boatlift Project,NOE,11/16/2022,11/16/2022,Install six 10” steel piles for a 21’6” x 28’ boatlift. Will be accessed by a gangway (3’x 20’). Tules were not present within or adjacent to the project area. Construction activities will be conducted between October 15 and December 31 to avoid impacts to the Clear Lake hitch. The project will further require a lakebed encroachment permit from Lake County Water Resources and a building permit from the Building Department. ,https://ceqanet.opr.ca.gov/2022110374,Sherman Boatlift Project,Laura L Hall,Lake County,Senior Planner,laura.hall@lakecountyca.gov,255 N. Forbes Street,,Lakeport,CA,95453,7072632221,39°0'15.92"N 122°43'34.85"W,Clearlake,Lake,Lake,Indian Garden Drive,95422,0.48, 036-431-07,,Clear Lake,,,,,,,,,,Categorical Exemption,"California Code of Regulations, Title 14, Division 6, Chapter 3, Section 15302, Class 2",Project includes the installation of six 10” steel piles for a 21’6” x 28’ boatlift. Will be accessed by a gangway (3’x 20’). Tules were not present within or adjacent to the project area. Construction activities will be conducted between October 15 and December 31 to avoid impacts to the Clear Lake hitch. ,,,,,,,,,,,,