SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022110169,Sacramento County,,,WHITE ROCK NORTH MINE,NOP,11/9/2022,,"The Project will require the following Sacramento County entitlements: • A SPA Implementation Permit to allow surface mining and reclamation on 2,125± acres for a period of 20 years, with an additional 3 years to complete reclamation. The Applicant requests the ability to mine and transport up to 3 million tons per year, with an average anticipated production of 1.25 million tons per year. Pursuant to Section 1A of the SPA Implementation Agreement, the SPA Implementation Permit will incorporate the mining plan, serve as the vehicle for imposing conditions, be subject to CEQA review, and be reviewed by the Planning Commission and Board of Supervisors. • A Reclamation Plan to return the land to its current undeveloped condition, which is readily adaptable to future uses allowed under the Aerojet SPA. • A Work Authorization Permit prior to commencement of any surface mining activities. • A Use Permit for a 1± acre off-site conveyor connection and undercrossing at White Rock Road to transport mined materials to the existing, separately permitted off-site Teichert Grantline processing plant. Any permitting for the portion of the conveyor connection south of White Rock Road would be separately addressed by Teichert, if needed. • A Development Agreement between the Applicant and the County of Sacramento. • An Encroachment Permit and Improvement Plans as needed to allow installation of a conveyor undercrossing and driveway improvements along White Rock Road.",https://ceqanet.opr.ca.gov/2022110169,WHITE ROCK NORTH MINE,Joelle Inman,Sacramento County Planning,ENVIRONMENTAL COORDINATOR,inmanj@saccounty.net,827 7th street,ste 225,sacramento,CA,95814,9168747575,,Sacramento,Sacramento,,,,,072-0231-141,,,,Yes,11/9/2022,12/8/2022,Mining,Use Permit,"Aesthetics, Air Quality, Biological Resources, Drainage/Absorption, Flood Plain/Flooding, Mineral Resources, Noise, Vegetation",11/9/2022,12/8/2022,,,,,,,,,,,,,,,