SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022110016,"Caltrans, District 11 - San Diego","California Department of Transportation, District 11",DOT,"Traffic Monitoring Station Maintenance in Imperial County, CA",NOE,11/1/2022,11/1/2022,"Caltrans proposes to reset Traffic Monitoring Station (TMS) assets’ lifecycle at various locations in Imperial County, CA. Specifically, controller units, plug-mounted equipment, shelf-mounted equipment and wall-mounted equipment will be replacing the existing cabinet equipment.",https://ceqanet.opr.ca.gov/2022110016,"Traffic Monitoring Station Maintenance in Imperial County, CA",Emery McCaffery,"Caltrans, District 11",Associate Environmental Planner,emery.mccaffery@dot.ca.gov,4050 Taylor Street,,San Diego,CA,92110,8582891270,,,Imperial,,,,,,,,,,,,,,,,,Categorical Exemption,15302,The project consists of replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced.,,,,,,,,,,,,