SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022100558,Temecula Valley Unified School District,,,GREAT OAK HIGH SCHOOL PRACTICE FIELD LIGHTING PROJECT,NOE,10/26/2022,10/26/2022,"Temecula Valley Unified School District (District) proposes to add nighttime sports lighting to the existing multiuse practice field at Great Oak High School. Field lighting would consist of five galvanized steel poles (two 90 feet, one 80 feet, and two 70 feet) with LED luminaires mounted at 70 to 90 feet. Each light pole would have 4 luminaires per pole for a total of 20 luminaires. Average light levels for the multiuse field would be approximately 30.1 foot-candles (fc) for the lined soccer field and 14.5 fc for the surrounding grass area outside of the soccer field. No additional sports program would be added that could increase participants or spectators. As with the existing conditions, the newly lit multiuse field would be available for use by community groups after school hours, when the facilities are not in use by students, and during weekends, as provided by the District’s use policy under the Civic Center Act. The proposed project would require limited demolition of hardscape and softscape to install lighting poles and trenching and backfilling for electrical utility improvements. The proposed project would disturb approximately 6,000 square feet of surface area of the approximately 51 acres of high school campus. No structural demolition would be required, and no PA system would be installed. The District is tentatively scheduled to start construction in November 2022, and the construction would take approximately six weeks. ",https://ceqanet.opr.ca.gov/2022100558,GREAT OAK HIGH SCHOOL PRACTICE FIELD LIGHTING PROJECT,Janet Dixon,Temecula Valley Unified School District,Director Facilities Development Dept.,jdixon@tvusd.us,31350 Rancho Vista Road,,Temecula,CA,92592,9515067914,33°26'59.8"N 117°5'37.8"W,Temecula,Riverside,Riverside,Deer Hollow Way and Pechanga Parkway,92592,6000 sqft,962020011,15,,0,,,,,,,,,Categorical Exemption,4 CCR §15301 Class 1; §15303 Class 3; 5304 Class 4; 15311 Class 11,"Existing Facilities, New Construction or Conversion of Small Structures, Minor Alterations to Land, Accessory Structures",,,,,,,,,,,,