SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022100385,Lake County,,,UP 21-29 Adobe Creek Processing Facility,MND,10/19/2022,,"The applicant is seeking approval for a commercial cannabis processing operation with a Type 6 Non-Volatile Cannabis Manufacturing License, a Type 13 Cannabis Distributor Transport only, Self-distribution License, and a Cannabis Processor License. The project is located on 4820 Loasa Road, Kelseyville, CA on APN 008-038-50. The proposed operation would utilize the existing facilities of the Project Parcel, along with the addition of ten 320 ft2 modular frozen harvest storage units. The proposed processing operation would be composed of: • a 44,440 ft2 Drying and Office Building (Existing Building #1) • a 23,744 ft2 Processing, Packaging, and Harvest Storage Building (Existing Building #2) • a 25,300 ft2 Cold Storage Building (Existing Building #3) • a 24,250 ft2 Drying Building (Existing Building #4) • a 1,000 ft2 Maintenance Building (Existing Building #7) • a 2,325 ft2 Security Building (Existing Building #8), and • ten (10) 320 ft2 Frozen Harvest Storage Areas (proposed modular freezer units). Existing vineyards in the south of the Project Parcel would be retained. New 6 ft chain link security fencing would be installed around the perimeter. Two new 24-foot wide gates will provide vehicular access. Metal tables, shelves, and racks will be installed within the existing buildings. ",https://ceqanet.opr.ca.gov/2022100385,UP 21-29 Adobe Creek Processing Facility,Andrew Amelung,County of Lake Community Development Department,Cannabis Program Manager,cannabisceqa@lakecountyca.gov,255 N. Forbes Street,,Lakeport,CA,95453,7072632221,,"Clearlake, Lakeport",Lake,,"Loasa Road, north of Merritt Road",,,008-038-50,,,,No,10/19/2022,11/17/2022,Other,Use Permit,"Aesthetics, Air Quality, Biological Resources, Cultural Resources, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Noise, Tribal Cultural Resources",10/19/2022,11/17/2022,,,,,,,,,,,,,,,