SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022100217,Riverside Unified School District,,,"JW North High School New Classroom Building, Gymnasium and Modernization Project",MND,10/11/2022,,"The proposed project would modernize JW North High School, including the limited demolition of existing asphalt, the removal of some existing portable structures, the renovation of other existing structures, and the construction of one new two-story classroom building, one new gymnasium, and outdoor facilities. A total of eight existing portables would be removed and a new 2-story science building would be developed to replace the portables. The new science building would have 8 classrooms, restrooms, preparation and storage rooms, and support space, which would total 14,575 square feet. The plans include an outdoor learning area, space for planting beds, and a new mini amphitheater. A new campus entry canopy structure will be provided along 3rd Street. A new gymnasium would be constructed north of the parking lot along Linden Street, east of the existing gymnasium, south of the kitchen, west of the weight and wrestling room, and will replace the existing hardtop basketball courts. The new gymnasium will be competition size at 12,000 square feet with a 900-seat capacity with an additional 5,419 square feet of support spaces. In addition to the construction of the new classroom building and gymnasium, the project includes upgrades to the HVAC and lighting in seven existing buildings within the campus as part of the proposed project. New landscaping and irrigation would be provided around the two new buildings. Improvements to shade structures, seating, and gathering areas near the existing library would be provided. Sitewide utilities upgrades and ADA compliance would be provided. ",https://ceqanet.opr.ca.gov/2022100217,"JW North High School New Classroom Building, Gymnasium and Modernization Project",Dwayne Mears,PlaceWorks,Principal,dmears@placeworks.com,"3 MacArthur Place, Suite 1100",,Santa Ana,CA,92707,7149669220 ext. 2316,33°58'52.8"N 117°20'45.6"W,Riverside,Riverside,,Chicago Avenue and 3rd Street,92507,43,"250-140-006, 250-140-007","SR-91, SR-60, and I-215",Santa Ana River,None,Yes,10/12/2022,11/10/2022,Educational,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire",10/12/2022,11/10/2022,,,,,,,,,,,,,,,