SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022100104,"Water Resources, Department of",California Department of Water Resources,DWR,Feather River Salmonid Habitat Improvement Project,MND,10/6/2022,,"The proposed project consists of the following key elements: (1) addition or replacement of approximately 16,000 cubic yards (CY) of spawning gravel to multiple locations within the river to improve spawning conditions in these areas, including building in-river access routes to reach these areas; (2) excavation of accumulated streambed material from the entrance of Moe’s Side Channel to improve hydraulic capacity and redistribute material at the head of Upper Auditorium Riffle to improve spawning conditions; (3) excavation of accumulated streambed material from the entrance and exit of the Bedrock Park side channel to increase flows and improve potential habitat accessibility; and (4) minor spoiling of excavated material in an area adjacent to the exit of the Bedrock Park Side Channel to avoid off-site haul of materials through a public park (see Figure2).Environmental commitments incorporated into the proposed project’s design include preparing a construction management plan; conducting worker environmental awareness training; implementing DWR’s greenhouse gas emissions reduction plan; and preparing a stormwater pollution prevention plan, spill prevention and control plan, and a fire protection and prevention plan.",https://ceqanet.opr.ca.gov/2022100104,Feather River Salmonid Habitat Improvement Project,Harmony Gugino,CA Department of Water Resources,Environmental Scientist,harmony.gugino@water.ca.gov,2440 Main Street,,Red Bluff,CA,96080,5305297393,39°30'53.25"N 121°33'44.96"W,Oroville,Butte,,,95965,15.8,multiple (see IS/MND),State Route 70,,,No,10/6/2022,11/7/2022,Other,Site Plan,"Aesthetics, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Geology/Soils, Greenhouse Gas Emissions, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Recreation, Tribal Cultural Resources, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,