SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022090281,Los Angeles County Public Works,Los Angeles County Department of Public Works,DPW,Compton Boulevard Bridge Over Compton Creek,MND,9/16/2022,,"The proposed project would involve the demolition of the existing two-span, steel-girder Compton Boulevard Bridge with a new two-span, pre-cast concrete bridge. The proposed project would address existing bridge deficiencies, enhance vehicular safety on the bridge and improve transportation efficiency by enabling larger trucks to utilize the bridge. The existing steel girder bridge and middle pier have been determined to be structurally deficient due to extensive cracking and delamination of the bridge deck. The new bridge soffit (underside) would be raised approximately one foot higher than the existing bridge. The new bridge would include a new pier with a new pre-cast, pre-stressed, concrete box beam structure supported by pile foundations, and new channel walls/abutments. The new abutments would be constructed approximately 15 feet behind the existing abutments, which would be protected in place with minimal modifications to provide clearance for the new bridge structure. Modification to the existing abutments that act as the channel walls would include removal of existing backwall down to the seat elevation to allow new bridge superstructure to span over the existing abutments. The existing channel walls outside of this limit will not be modified. Additionally, a new, sloping concrete pier nose would be constructed upstream from the bridge as part of the proposed project. In addition to the proposed bridge replacement, the proposed project would include reconstruction of the existing bicycle path, which runs adjacent to the north of the Compton Creek channel, as well as reconstruction of several sidewalk and driveway locations and the reconstruction of a new access road. ",https://ceqanet.opr.ca.gov/2022090281,Compton Boulevard Bridge Over Compton Creek,Reyna Soriano,County of Los Angeles Department of Public Works,Civil Engineer,RSoriano@dpw.lacounty.gov,900 South Fremont Avenue,,Alhambra,CA,91803-5100,6264585192,33°53'45.1"N 118°14'9.53"W,Compton,Los Angeles,,Compton Boulevard and Wilmington Avenue,90220,1.21,N/A within Right-Of-Way,State Route 91,Compton Creek,Compton/Woodley Airport,No,9/16/2022,10/17/2022,Transportation,Redevelopment,"Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire",9/16/2022,10/17/2022,,,,,,,,,,,,,,,