SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022090177,"Escalon, City of",City of Escalon,,PHASE 2 MCHENRY SEWER LINE PROJECT,MND,9/12/2022,,"The Project is the proposed installation of approximately 4,500 feet of 24"" PVC sewer pipeline within existing street right-of-way and easements. The proposed Project will extend the City of Escalon sewer system to the existing Escalon Treatment Plant to the south, near McHenry Avenue immediately north of the Stanislaus River. The Project is intended to provide sewer services consistent with the City's approved Sewer Master Plan and General Plan. The Project will relocate and upsize a portion of the City’s sewer main currently located in McHenry Avenue paved right-of-way within City Limits of Escalon. The Project is a planned improvement that was evaluated in the approved General Plan and Sewer Master Plan for the City of Escalon. The need for the Project is based on future population growth projections in the City of Escalon as well as the anticipated changes in land use from the full buildout of the approved General Plan for the City. The McHenry Sewer Main will be bored and jacked, under a South San Joaquin Irrigation District Main Irrigation Canal and be installed via open trench construction under the existing Meyer Avenue asphalt roadway and County of San Joaquin Easement. The Meyers Avenue roadway surface is to be removed, and a new Meyers Avenue asphalt roadway will be constructed consistent with the City of Escalon’s engineering standards for street design in the original road location. Project implementation will require removal of approximately 49 almond trees located in the existing San Joaquin County Right-Of-Way.",https://ceqanet.opr.ca.gov/2022090177,PHASE 2 MCHENRY SEWER LINE PROJECT,Lori Trottier,Ardurra,Environmental Lead,Ltrottier@ardurra.com,3737 Birch Street,,Newport Beach,CA,92660,9492353094,37°46'7.4"N 120°59'45.7"W,Escalon,San Joaquin,,McHenry Avenue at Meyers Road,95320,3.28ac Temporary,NA,SR 108 and SR120,Stanislaus River and South San Joaquin Main Canal,NA,Yes,9/12/2022,10/11/2022,Other,,"Air Quality, Biological Resources, Cultural Resources, Geology/Soils, Mandatory Findings of Significance, Noise",9/8/2022,10/10/2022,,,,,,,,,,,,,,,