SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022090147,"Fish and Wildlife, Region 6 - Inland Deserts, Ontario","California Department of Fish and Wildlife, Inland Deserts Region 6 ",CDFW, ETS 46898 – L235 CP DIGS NEWBERRY SPRINGS (Lake or Streambed Alteration Agreement Amendment EPIMS No. SBR-16113),NOE,9/9/2022,9/9/2022,"The California Department of Fish and Wildlife (CDFW) has executed an amendment to the Lake or Streambed Alteration Agreement number EPIMS-SBR-16113-R6 pursuant to Section 1602 of the Fish and Game Code to Southern California Gas Company (SoCalGas). The project amendment is limited to the removal and replacement of two 300-foot segments of 30-inch pipeline at Mile Post (MP) 124.93 and MP 124.56. Included in the pipeline replacement, are the removal and replacement of the electrical test stations, junction boxes and wiring, as well as the installation of 60# anodes and pipeline connections. Each segment of pipeline to be replaced will require a 50-foot x 600-foot (30,000 square foot) temporary work area for the excavation of soils and access to the existing pipeline. An additional 50-foot x 400-ft (20,000 square foot) temporary work area (MP 124.74) along the right of way is required between the two excavation sites for excavated spoils and staging of materials and equipment. The planned pipeline replacements and related equipment will be installed within the existing SoCal Gas Right of Way. Once the pipeline has been replaced the crews will backfill the trench using previously excavated soils and re-contour the work site to preproject grades.",https://ceqanet.opr.ca.gov/2022090147, ETS 46898 – L235 CP DIGS NEWBERRY SPRINGS (Lake or Streambed Alteration Agreement Amendment EPIMS No. SBR-16113),Julia Karo,California Department of Fish and Wildlife Inland Desert Region,Environmental Scientist,Julia.Karo@wildlife.ca.gov,3602 Inland Empire Blvd.,Suite C-220,Ontario,CA,91764,9092782952,34°46'20.7"N 116°36'26.3"W,,San Bernardino,San Bernardino,,,,,,,,,,,,,,,,Categorical Exemption,"Class 1; California Code of Regulations, title 14, section (15301)","This proposed Project is limited to the inspection and operation of existing public structures, facilities, mechanical equipment, or topographical features.",,,,,,,,,,,,