SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022090046,Stanislaus County,,,Gallup Creek Bridge(No. 38C0170) on Cooperstown Road Replacement Project,MND,9/2/2022,,"The Stanislaus County Public Works Department (County) proposes to improve public safety by replacing Gallup Creek Bridge (No. 38C0170) on Cooperstown Road with a new two-lane bridge in the same location as the existing bridge. The existing bridge is County owned and maintained. The proposed new bridge would be a two-span, cast-in-place, concrete slab bridge and aligned on the existing alignment. The new roadway profile would not need to be raised significantly. Rock slope protection would be placed at both abutment embankments. The bridge would be closed during construction while traffic would use a temporary detour adjacent to the existing Cooperstown Road. This temporary detour would be approximately 15 feet wide and would be located just south of Cooperstown Road. The low-water crossing would be constructed by laying a temporary pipe atop the creek bed perpendicular to the road and covering it with clean crushed rock. The pipe and rock used for the temporary crossing would be removed at the end of construction. The existing bridge would be demolished and removed from the project are as construction progresses. ",https://ceqanet.opr.ca.gov/2022090046,Gallup Creek Bridge(No. 38C0170) on Cooperstown Road Replacement Project,Chuck Covolo,Stanislaus County Public Works,Sr. Civil Engineer,covoloc@stancounty.com,1716 Morgan Road,,Modesto,CA,95358,2095254130,,,Stanislaus,,Cooperstown Road,95329,1.76,008-014-017 & 018,,Gallup Creek,,Yes,9/2/2022,10/3/2022,Other,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Solid Waste, Transportation, Vegetation, Wetland/Riparian",9/2/2022,10/3/2022,,,,,,,,,,,,,,,