SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022080711,Riverside County Transportation Commission,,RCTC,Perris-South Station and Layover Facility Expansion Project,NOE,8/31/2022,8/31/2022,"RCTC, in partnership with the Southern California Regional Rail Authority (SCRRA, Metrolink), are proposing to expand the South-Perris Station and Layover Facility. In June 2016, RCTC and SCRRA began operations of the commuter rail service on a 24-mile extension of the Metrolink 91 Line, now referred to as the 91/Perris Valley Line (91/PVL). The Perris-South Station Expansion will add a second station track, approximately 1000 foot long, a second platform and lengthen the existing platform from 510 feet to 680 feet to accommodate the SCRRA standard 8-car train length (680 feet) on both platforms. The new platform will be fitted out with the same passenger amenities present at the existing platform, including canopies, mini-high platform, emergency telephone, electronic displays, and signage. A new at-grade pedestrian crossing with active warning gates and flashing lights will allow access to the new platform. The Layover Facility Expansion project will add a fourth Layover Track and all the required support facilities.",https://ceqanet.opr.ca.gov/2022080711,Perris-South Station and Layover Facility Expansion Project,Gustavo Quintero,Riverside County Transportation Commission,Project Coordinator,GQuintero@bec-riv.org,"4080 Lemon Street, 3rd Floor",,Riverside,CA,92501,9517877935,,Perris,Riverside,Riverside,Case Road and Mapes Road,,,,I-215 and SR74,,Perris Airport,,,,,,,,,Statutory Exemption,CEQA under Public Resources Code section 21080(b)(10) and State CEQA Guidelines section 15275,"The project is statutorily exempt from CEQA under Public Resources Code section 21080(b)(10) and State CEQA Guidelines section 15275, both of which exempt projects that relate to the “institution or increase of passenger or commuter services on rail or highway rights-of-way already in use, including modernization of existing stations.” Here, the project falls within this exemption as it seeks to modernize the existing South-Perris Station and Layover Facility, which is already in use. Moreover, the project would add operational flexibility for eventual improved regional rail and mobility service, which will support increased capacity. The project is therefore exempt from CEQA. ",,,,,,,,,,,,