SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022080491,"Parks and Recreation, Department of",California Department of Parks and Recreation,,Class II Weathered Steel Bridge Replacement,NOE,8/23/2022,8/23/2022,"Replace an existing, failing foot bridge along the Prairie Creek Trail in Prairie Creek Redwoods State Park to allow for safe, continued, public access to, and along this trail. The new bridge will be located 10 feet to the south of the existing bridge and will be longer, to allow for construction outside of the stream bed. Work will: • Set up tarps beneath the existing structure to capture falling debris; • Attach rigging to surrounding trees to assist in the removal and placement of materials; • On either side of the creek, excavate to install 10 foot long, 3 foot deep and 10-inch-high concrete (rebar reinforced) mud sills; • Excavate for four (4) 25 feet long by 1 foot wide by 6 inches deep footings on either side of the creek to construct ramp approaches at either end of the bridge for an even linear grade trail alignment; • On the east (left) bank, excavate to install a 12 foot long by 3 foot deep by 2-foot-high cribbed abutment to level the bridge site; • Use the overhead rigging to lift the new stringers into place and attach decking and rails to the superstructure; • Remove and dismantle the old bridge, remove any hardware from untreated redwood and scatter the untreated redwood across the forest floor, out of view; and • Remove treated wood and the hardware from the site and dispose of at the maintenance yard and disassemble the rigging and pack out from the site.",https://ceqanet.opr.ca.gov/2022080491,Class II Weathered Steel Bridge Replacement,Rosalind Litzky,Parks and Rec,District Planner,rosalind.litzky@parks.ca.gov,3431 Fort Ave,,Eureka,CA,95503,7076835062,,,Humboldt,Humboldt,,,,,,,,,,,,,,,,Categorical Exemption,"15301, 15303, and 15304","Project consists of the repair, maintenance or minor alteration of existing public facilities involving negligible or no expansion of use beyond current levels; the construction and location of limited numbers of small new facilities and structures; included as “Trail construction or realignment” in the Department of Parks and Recreation’s list of exempt activities in accordance with CCR §15300.4, and the minor public alteration in the condition of land and vegetation which do not involve removal of large, mature, scenic trees.",,,,,,,,,,,,