SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022080248,"Hesperia, City of",City of Hesperia,,Poplar 18 Project,FIN,1/31/2023,,"The Project would include construction of an industrial warehouse building and associated improvements on 17.87 acres of vacant land. The proposed project would provide 414,700 square feet of industrial/warehouse space and include associated improvements, such as loading docks, tractor-trailer stalls, passenger vehicle parking spaces, stormwater detention basins, and landscape area. Office space within the building would be distributed among four individual office spaces in each of the corners of the building. At this time, the project applicant does not an1icipate leasing any portion of the buildings to a tenant that would require refrigerated space. The Project would include off-site improvements along Mesa Linda Street, Lassen Street, and Poplar Street, including frontage landscaping and pedestrian improvements. A variety of trees, shrubs, plants, and land covers would be planted within the Project frontage's landscape setback area, as well as within the landscape areas found around the proposed industrial/warehouse buildings and throughout the Project site. Off-site improvements include possible lateral connections for utilities and other roadway and pedestrian improvements (e.g., road repaving or installation of sidewalks along building frontages). ",https://ceqanet.opr.ca.gov/2022080248/3,Poplar 18 Project,Ryan Leonard,"City of Hesperia, Planning Department",Senior Planner,rleonard@cityofhesperia.us,9700 Seventh Ave,,Hesperia,CA,92345,7608471651,34°25'43"N 117°23'33"W,Hesperia,San Bernardino,,Poplar & Mesa Linda Street, 92345,17.87,3064-581-04-0000 & 3064-581-05-0000,"1-15, US Hwy 395"," Oro Grande Wash, California Aqueduct", N/A,No,,,Industrial,"Site Plan, Use Permit","Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,