SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022080215,"Windsor, City of",Town of Windsor,,"BoDean Construction Materials Processing Plant, Planned Development, and Subdivision Project",NOP,8/10/2022,,"1. Zoning Ordinance Amendment (Rezone) from Heavy Industrial (HI) to Planned Development (PD). The proposed PD development standards would allow building heights up to 100 feet with a Minor Use Permit or Conditional Use Permit. 2. Tentative Subdivision Map to divide the parcel into four lots ranging in size from approximately 2.10 acres to approximately 6.82 acres. 3. Conditional Use Permit to develop a construction materials processing facility on proposed Lot 1, approximately 6.82 acres, located at the northern end of the project site, and bound by Pruitt Avenue on the north, Caletti Avenue on the west, Standard Avenue on the east, and proposed Lot 2 on the south. 4. Site Plan and Design Review for the construction materials processing facility on proposed Lot 1.",https://ceqanet.opr.ca.gov/2022080215,"BoDean Construction Materials Processing Plant, Planned Development, and Subdivision Project",Kim Voge,"Town of Windsor, Community Development Department ",Planner III,kvoge@townofwindsor.com,9291 Old Redwood Highway,Building 400,Windsor,CA,95492,7078381106,38°31'22"N 122°47'32"W,Windsor,Sonoma,,Pruitt Avenue and Caletti Avenue,95492,13.46,059-271-103-000,US 101,Pruitt Creek,Charles M. Schulz - Sonoma ,Yes,8/10/2022,9/8/2022,Industrial,"Land Division (Subdivision, etc.), Planned Unit Development, Redevelopment, Rezone, Site Plan, Use Permit","Aesthetics, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Noise, Public Services, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,