SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022070521,West Valley Water District,,,18-Inch Transmission Main Installation Project,MND,7/28/2022,,"The District’s service area includes Pressure Zone 7, which is north of Pressure Zone 6 in WVWD’s North System. Storage in this area is provided by District Reservoirs (R7-1, R7-2, R7-3, and R7-4) located on Lytle Creek Road. There is currently no source of supply within Pressure Zone 7, as water is boosted from the Lower Pressure Zones (4, 5, and 6) to serve that area. As such, the District is proposing a new 650 LF 18-inch transmission main to facilitate supply to accommodate the increase in development that is projected to occur in Pressure Zone 7. WVWD proposes to install approximately 650 linear feet (LF) of 18-inch transmission main within Pressure Zone 7. The proposed transmission main will connect to an existing 18-inch transmission main at Lytle Creek Road and bore under the Ontario I-15 freeway and terminate at Citrus Avenue in an unimproved area. Approximately 250 LF of 18-inch diameter pipe will be trenched in the unimproved area. The proposed pits for the jack and bore will be approximately 40 feet in length and 20 feet in width and will be located outside the Caltrans right-of-way. The pipeline that will traverse under the I-15 includes trenchless installation of approximately 325 LF of 18-inch diameter carrier pipe in a 30-inch diameter casing under the I-15 Freeway to connect to segments at either side of the freeway. The segments of pipeline will be installed mostly within undisturbed areas between Lytle Creek Road and Citrus Avenue.",https://ceqanet.opr.ca.gov/2022070521,18-Inch Transmission Main Installation Project,Rosa Gutierrez,West Valley Water District,Senior Engineer,rgutierrez@wvwd.org,855 W. Baseline Road,,Rialto,CA,92376,9096440592,34°10'17.51"N 117°27'12.8"W,Fontana,San Bernardino,,Lytle Creek Road to the north and Citrus Avenue to the south,92336,< 1 acre,023-908-101,I-15,Lytle Creek,N/A,No,8/1/2022,8/30/2022,Other,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,