SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022070495,"Forestry and Fire Protection, Department of",California Department of Forestry and Fire Protection,CAL FIRE,San Luis Obispo Unit Paso Robles Air Attack Base Barracks Installation,NOE,7/27/2022,7/27/2022,"The San Luis Obispo Unit needs to provide a permanent structure for firefighter and Department staff at the Paso Robles Air Attack Base (PRAAB) in Paso Robles, California. The project involves the installation of an approximately 4,500 square foot barracks located at Paso Robles Municipal Airport, Paso Robles, CA 93446. The proposed building location lies on an undeveloped area next to the existing structures at the PRAAB. The project area is a previously disturbed site consisting of artificial fill and gravel void of any native vegetation and routinely disked for dryland farming operations. A new concrete pad will be poured to act as a foundation to the new AAB Barracks and a parking lot will be paved. The footprint of the concrete pad will be approximately 4,500 square feet. Prior to laying new concrete, the ground will be leveled to ensure the quality of the foundation. In addition to the new concrete pad, minimal ground disturbing activities will occur to facilitate sewer connections to the building. The sewer line will require approximately 75’ of trenching and will be roughly 24” deep and 18” wide. Trench spoil will be mounded adjacent to the trench and immediately backfilled/compacted. Utility connections will utilize the existing conduit in place from the existing AAB buildings. All ground disturbing activities will occur within the perimeter of the existing disturbed site. Installation activities are anticipated to take approximately 300 working days to complete. Less than one acre of soil will be disturbed, and areas will be backfilled to original grade, which will prevent any change in drainage pattern.",https://ceqanet.opr.ca.gov/2022070495,San Luis Obispo Unit Paso Robles Air Attack Base Barracks Installation,Christina Snow,California Department of Forestry and Fire Protection,Senior Environmental Planner,christina.snow@fire.ca.gov,1131 S Street,,Sacramento,CA,95811,9163241639,,Paso Robles,San Luis Obispo,,Airport Road,93446,,,Highway 46,,Paso Robles Municipal Airport,,,,,,,,,Categorical Exemption,Class 3 Section 15303 New Construction,The proposed project is located within an active Municipal Airport on land that has been previously disturbed and does not involve removal of trees or adversely impact sensitive plant or wildlife species. ,,,,,,,,,,,,