SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022070366,Energy Commission,California Energy Commission,,Robust Airport Charging for Electric Ride Hail Fleets "RACER" Project,NOE,7/20/2022,7/20/2022,"Install and provide DCFC equipment capable of supporting 48 EV simultaneously at one charging site, an already paved parking lot near Los Angeles International Airport, for ride-hailing and taxi drivers.",https://ceqanet.opr.ca.gov/2022070366,Robust Airport Charging for Electric Ride Hail Fleets "RACER" Project,Anita Carraher,California Energy Commission,Energy Analyst,Anita.Carraher@Energy.ca.gov,715 P Street,,Sacramento,CA,95814,5106480362,,Los Angeles,Los Angeles,,"5455 W 111th St, Los Angeles, CA 90045",90045,,,,,,,,,,,,,,Categorical Exemption,"Cal. Code Regs., tit. 14, sec. 15301, 15303, 15304","This project involves the installation of approximately 48 electric vehicle chargers, and supporting hardware, housed within approximately 6 shipping containers, at an existing paved parking lot. The containers will be installed on the parking lot, connected to existing electrical panels also located within the existing lot, and will involve negligible or no expansion of use. Therefore, the project falls within section 15301 and will not have a significant effect on the environment. This project consists of installation of approximately 6, 20' shipping containers pre-fabricated with electric vehicle charging equipment installed inside each container. There will be a total of approximately 48 charging stations inside all of the containers. The overall dimensions are approximately 278' x 66'. Therefore, the project falls within section 15303 and will not have a significant effect on the environment. In this project, minor trenching may be necessary to lay two-inch conduit from the existing electrical panel to the charging equipment, totaling approximately 2 cubic feet per foot of distance from the electrical panel, to connect the proposed new electric vehicle charging station equipment to an existing electrical supply panel. The trenching will take place on currently paved ground, will not involve the removal of any trees, and surface will be restored. Therefore, the project falls within section 15304 and will not have a significant effect on the environment.",,,,,,,,,,,,