SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022070356,Tuolumne Utilities District,,,Cedar Ridge Intertie Project,NOE,7/20/2022,7/20/2022,"The project will construct a new pump station on an easement located on the property adjacent to the Crystal Falls Water Treatment plant. Construct 4,000 linear feet of 6"" water main to intertie the Crystal Falls Water System to the Cedar Ridge Water System. The water main will run from the new pump building, up the Christal Falls Treatment Plant driveway to Mt. Elizabeth Dr. The main will then run to the west on Mt. Elizabeth Dr. and tie into an existing 6"" water main where pavement begins. Tree clearing will be required in the easement on the adjacent property to make space for a 16' x 16' cinderblock building that will house the pumping equipment. A gravel road and parking area will also be installed on the easement. Grading activities on the easement will amount to less than 1 0 cubic yards of material moved, and there will be no export. Duff from the site will be used on site as erosion control.",https://ceqanet.opr.ca.gov/2022070356,Cedar Ridge Intertie Project,Cyndi Schlenz,Tuolumne Utilities District,Engineering Coordinator,cschlenz@tudwater.com,18885 Nugget Blvd.,,Sonora,CA,95370,2095325536,,Sonora,Tuolumne,Tuolumne,Mt. Elizabeth Dr.,95370,,APN 36-020-019,,,,,,,,,,,,Categorical Exemption,"Section 15303, Class 3",The new pump building will have a maximum 16'x16' footprint categorized as a small facility placed on an easement previously acquired by the district for the purpose of building structures incidental to the treatment plant.,,,,,,,,,,,,