SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022070212,"Highland, City of",City of Highland,,NWC of 3rd Street and Central Avenue Warehouse Project,MND,7/13/2022,,"The project site is located at a 3.01-acre property at the northwestern corner of 3rd Street and Cypress Avenue in the City of Highland, California. The project site consists of vacant land and vehicle storage uses. The existing site contains a semi-truck and trailer staging lot, a mobile office trailer, and a garage type structure. The project would include demolition of the existing structures on-site and construction of an approximately 54,330-square-foot (gross area, inclusive of mezzanine/office spaces), one-story warehouse building on an approximately 3.01-acre site (gross area). The warehouse building would be composed of approximately 48,330 square feet of warehouse space and 6,000 square feet of mezzanine/office space. The warehouse building would have a maximum height of 42.5 feet when measured from grade. Given that the City’s Municipal Code allows for a maximum height of 35 feet in the Business Park zone, a minor variance (Variance No. VAR 22-001) is being requested to accommodate the project’s height. The project would not contain any cold storage space.",https://ceqanet.opr.ca.gov/2022070212,NWC of 3rd Street and Central Avenue Warehouse Project,Angela Tafolla,City of Highland,Assistant Planner,atafolla@cityofhighland.org,27215 Base Line,,Highland,CA,92346,9098646861 ext. 259,34°6'24.4"N 117°13'4.1"W,Highland,San Bernardino,,Northwest corner of 3rd Street and Central Avenue,92346,3.01,"1192-561-11, -15 ,-16 ,-17 ,-18 ,-19 ,-20, and -21",210,Santa Ana River,San Bernardino Intl Airport,No,,,Industrial,"Site Plan, Use Permit","Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Economics/Jobs, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire",7/13/2022,8/1/2022,,,,,,,,,,,,,,,