SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022070197,"Chino, City of",City of Chino,,City of Chino State Street Water Treatment Project (WA212),NOD,10/20/2022,10/20/2022,"The proposed project consists of development of a State Street Water Treatment Facility (State Street WTF), which will be a new centralized treatment project that will treat water from Wells 12 and 14 for nitrate, perchlorate, and 1,2,3-TCP. The project also includes installation of offsite water transmission and brine pipelines, improvements to the existing wells, and site improvements. The water treatment facility will have a capacity to treat up to 4,000 gallons per minute (gpm) and the anticipated extraction rate from each well is 2,000 gpm. The proposed project would provide treatment for nitrate, perchlorate, and 1,2,3 TCP at Wells 12 and 14. Treatment is anticipated to include pretreatment through sand separators followed by cartridge filters (solids removal), 1,2,3-TCP Removal through Granular Activated Carbon (GAC), perchlorate and nitrate removal through a proprietary ion exchange (IX) treatment system, then disinfection and storage in Reservoir 5 before distribution. The IX treatment system generates wastewater known as brine, that will be disposed of through a new connection to north Non-Reclaimable Wastewater System (NRWS) brine disposal pipeline that is managed locally by the Inland Empire Utilities Agency (IEUA). The GAC system generates a periodic backwash water when the media is replaced that will be disposed of accordingly. ",https://ceqanet.opr.ca.gov/2022070197/2,City of Chino State Street Water Treatment Project,Maria Fraser,City of Chino,CIP Engineering Manager,mfraser@cityofchino.org,13220 Central Avenue,,Chino,CA,91710,9093343310,34°3'31.34"N 114°40'53.48"W,Chino,San Bernardino,San Bernardino,West State Street and South Benson Avenue,91710,~4.51,101124118 and 101404210,I-10 & SR-60,N/A,Ontario Int'l Airport,,,,,,,,,,,,City of Chino,Yes,10/19/2022,No,No,Yes,,Yes,Yes,No,No,"Chino City Hall, 13220 Central Avenue, Chino, CA 91710"