SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022070186,"Redlands, City of",City of Redlands,,City Center Project,SCA,7/12/2022,,"The Project proposes to construct a new mixed-use development consisting of multi-family residential units and restaurant uses. The Project would also develop a ground floor and subterranean parking garage located beneath the proposed residential building. The Project includes 131 multifamily dwelling units and 23,476 square feet (SF) of amenity space consisting of a 9,770 SF roof deck, a 7,380 SF pool plaza, a 5,356 SF spa plaza, and a 527 SF upper lounge. The Project also proposes 10,550 SF of restaurant space on the corner of Eureka Street and Brookside Avenue. The proposed apartment building would be 4-stories with a maximum height of 55 feet from grade. The proposed restaurant buildings would be 30 feet in height. The Project would be accessed via four proposed driveways: two along Brookside Avenue, one along Eureka Street, and one along West Citrus Avenue. The Project proposes a single-level parking structure beneath the apartment building with approximately 100 covered parking spaces to serve future residents. Access to this parking structure would be provided the internal access lane to the north of the proposed residential building. In addition to the proposed parking structure, the Project also proposes a surface lot for with 112 spaces for restaurant employees, restaurant patrons, and guests. The Project would install a variety of ornamental shrubs and groundcovers for a total of 17,303 SF of landscape area. The proposed Project would dedicate 5 feet of right-of-way to Citrus Avenue and 4 feet of right-of-way to Eureka Street. The Project would construct new 8-foot-wide sidewalks along Eureka Street, Citrus Avenue, and Brookside Avenue. New curb and gutter are proposed along the northeast property line. A new curb is also proposed along a portion of the northwest property line. The Project would install new onsite potable water infrastructure that would connect to existing 12-inch domestic water lines in Brookside Avenue and Eureka Street. Additionally, the Project would install fire water lines onsite that would connect to the existing and proposed 12-inch domestic water lines in Brookside Avenue and Eureka Street. The Project would install two new 14-inch onsite sewer lines that would connect to the existing 14-inch sewer line in First Street and a new 14-inch sewer line in Eureka Street that would connect to the existing 8-inch sewer line in North Eureka Street. The Project also proposes to realign existing public and private sewer lines within the site. The Project would install new storm drain lines throughout the site and realign existing storm drain lines. Two corrugated metal pipe (CMP) underground storage systems are proposed: one in the northeastern portion of the Project site and the other in the northwestern portion of the Project site. ",https://ceqanet.opr.ca.gov/2022070186,City Center Project,Sean Reilly,City of Redlands,Principal Planner,sreilly@cityofredlands.org,"35 Cajon Street, Suite 20",,Redlands,CA,92373,9097987555 ext. 7344,33°3'20.5"N 117°11'10.7"W,Redlands,San Bernardino,,"Brookside Avenue, Eureka Street, W. Citrus Avenue",92373,3.03,017-110-101 through -105; 017-121-111 through -121,I-10,Santa Ana River,,No,7/13/2022,8/12/2022,"Commercial, Residential","Land Division (Subdivision, etc.), Site Plan, Use Permit","Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire",7/13/2022,8/12/2022,,,,,,,,,,,,,,,