SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022070033,"Regional Water Quality Control Board, Region 6 - South Lake Tahoe","California Regional Water Quality Control Board, Lahontan South Lake Tahoe Region 6 ",RWQCB,South Tahoe Public Utility District Tallac Creek Pipeline Emergency Repair Project,NOE,7/5/2022,7/5/2022,The South Tahoe Public Utility District (STPUD) sewer pipeline intersects Tallac Creek just south of Baldwin Beach on Lake Tahoe. This pipeline's structural integrity at the crossing of Tallac Creek has been compromised due to erosion from Tallac Creek around the foundation of the concrete encasement surrounding the pipeline. STPUD proposes to temporarily stabilize the concrete encasement using steel beams spanning above the Tallac Creek channel. The steel beams would be attached to support beams placed on pre-cast concrete foundations situated outside the low-flow creek bed on the banks of Tallac Creek. The concrete encasement would be supported with a series of thick ratchet straps wrapped on the underside of the encasement and secured to the steel beams by tensioning the ratchet straps. The design concept could be constructed without placing equipment in Tallac Creek and would facilitate installation of permanent stabilization measures as part of the future permanent grade control structure project proposed for implementation in September 2022. ,https://ceqanet.opr.ca.gov/2022070033,South Tahoe Public Utility District Tallac Creek Pipeline Emergency Repair Project,Jennifer Callahan,RWQCB,Environmental Scientist,Jennifer.Callahan@waterboards.ca.gov,2501 Lake Tahoe Blvd,,South Lake Tahoe,CA,96150,5305425416,38°56'37.3"N 120°4'14.8"W,South Lake Tahoe,El Dorado,El Dorado,,,,,,,,,,,,,,,,Emergency Project,21080(b)(4); 15269(b)(c),"The Water Board has determined that this Project is exempt from the California Environmental Quality Act (CEQA; Public Resources Code sections 21000, et seq.). In accordance with Section 15269, the basis for CEQA exemption is “Emergency Projects”.",,,,,,,,,,,,