SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022060281,Yuba County,,,TPM2021-0014 (ARO Developments),NOE,6/15/2022,6/15/2022,"Tentative Parcel Map to create five industrial parcels from a 20.116 acre property located at 4529 Arboga Road in the community of Olivehurst (APN: 013-300-017). The 2030 General Plan designates the land use as Valley Neighborhood and the zoning as “IL” Light Industrial. Parcels 1 and 3 are proposed to be 3.5± acres in size, Parcels 2 and 4 are proposed to be 3.66± acres in size, and Parcel 5 is proposed to be ±5.5 acres in size.",https://ceqanet.opr.ca.gov/2022060281,TPM2021-0014 (ARO Developments),Rehan Rana,"ARO Developments, LLC",Owner,arodevelopmentsllc@gmail.com,"990 Klamath Lane, Suite 5",,Yuba City,CA,95993,5304433009,39°5'5"N 121°33'36"W,,Yuba,Yuba,Arboga Road and Skyway ,95901,20.116,013-300-017-000,HWY 70,,Yuba County Airport,,,,,,,,,Categorical Exemption,15315 (Minor Land Division),"The proposed project meets all the requirements of Sections 15315. The project is the creation of five parcels and is located in an urbanized area; it is consistent with both the General Plan and zoning; access exists to the site via Arboga Road; OPUD will provide water and wastewater services upon annexation; PG&E will provide gas and electrical services; the project has not been subdivided in the last 2 years; no variances or exceptions to County standards are required; and the project does not have an average slope over 20 percent. The 20 acre project site is relatively flat and contains no habitat for protected biological resources. Parcel 5 of the proposed project is mainly located within Flood zone A and has been conditioned by RD-784 and the Yuba County Public Works Department to safely build on the proposed industrial parcels. For this reason, any potential impacts for drainage will be addressed at time of development. ",,,,,,,,,,,,