SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022060263,Ventura County,,,Pressure Zone 538 Reservoir Replacement,MND,6/14/2022,,"The existing Pressure Zone 538 Reservoir is composed of a welded steel tank approximately 39 feet in diameter and 24 feet tall. The tank is painted green and is located within an 0.38 acre easement on APN 163-0-010-27. The reservoir site is fenced with chain-link fencing, and includes associated piping, valves and pumps. The site is accessed from a paved agricultural road along the east side of the easement. The proposed project consists of the removal of the existing 210,000-gallon Pressure Zone 538 Reservoir and replacement with two 300,000 gallon above-ground tanks within the existing easement. The proposed project would be constructed in three phases: • Phase 1. Construction of the common tank pad and Tank 1 to serve the Somis Ranch Farmworker Housing Project (about 12 months). • Phase 2. Construction of the booster pump station (about nine months). • Phase 3. Construction of Tank 2 to serve existing Waterworks District No. 19 customers (about 12 months",https://ceqanet.opr.ca.gov/2022060263,Pressure Zone 538 Reservoir Replacement,Ryan Lippincott,Ventura County Public Works Water & Sanitation,Project Manager,ryan.lippincott@ventura.org,PO Box 250,,Moorpark,CA,93020,8053783018,34°15'15"N 118°58'34"W,Camarillo,Ventura,,Worth Way/Castillo de Rosas,93066,0.4,163-0-010-27,"SR 118, SR 34",Arroyo Las Posas,,No,,,Water Facilities,Site Plan,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire",6/16/2022,7/18/2022,,,,,,,,,,,,,,,