SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022060071,"Elk Grove, City of",City of Elk Grove,,8633 Bader Road Map (PLNG20-013),NOE,6/3/2022,6/3/2022,"The 8633 Bader Road Map consists of a Tentative Parcel Map (TPM) to subdivide an existing parcel into three parcels ranging in size from 5 acres to 10 acres. Each parcel will have access from Mix Lane. No new construction is proposed with this Project; however, any new home construction will be required to comply with the City’s Climate Action Plan (CAP) measures for new single-family construction.",https://ceqanet.opr.ca.gov/2022060071,8633 Bader Road Map (PLNG20-013),Joseph Daguman,City of Elk Grove,Associate Planner,jdaguman@elkgrovecity.org,8401 Laguna Palms Way,,Elk Grove,CA,95758,9164782283,,Elk Grove,Sacramento,Sacramento,,,,122-0240-001,,,,,,,,,,,,Other,Consistent With a Community Plan or Zoning [Section 15183(a)],"The proposed Project is consistent with the development density established by the General Plan EIR because the parcel split will result in new parcels over five acres in size at a density consistent with the Rural Residential range of 0.1 to 0.5 units per acre. While there is no physical construction proposed with this Project, the map could accommodate the development of three, new single-family residential units. Any new construction shall comply with EGMC Section 23.29.020, development standards and Section 16.44, land grading and erosion control, and Section 19.12, tree protection and preservation. In addition, as indicated in the project description, construction of the proposed Project shall conform to the City’s adopted Climate Action Plan (CAP) for green building, EV ready, and construction monitoring",,,,,,,,,,,,