SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022060016,San Mateo County Harbor District,,,Oyster Point Marina Dock Replacement,NOE,6/1/2022,6/1/2022,Replacement of existing floating docks and accessways at Oyster Point Marina,https://ceqanet.opr.ca.gov/2022060016,Oyster Point Marina Dock Replacement,James Pruett,San Mateo County Harbor District,General Manager,jpruett@smharbor.com,P.O. Box 1449,,El Granada,CA,94019,6508224144,37°39'48.2"N 122°22'32.3"W,South San Francisco,San Mateo,San Mateo,,94080,,,,,,,,,,,,,,Categorical Exemption,"15302, Replacement or Reconstruction","The Project is categorically exempt in accordance with Article 19 of the CEQA Guidelines, Title 14, Class 2, Section 15302, Replacement or Reconstruction (b) replacement of a commercial structure with a new structure of substantially the same size, purpose, and capacity. There is no proposed increase in capacity or substantial expansion of the Marina. Floats, accessways, and piles would be substantially the same size as the existing. ",,,,,,,,,,,,