SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022050302,"Santa Barbara, City of",City of Santa Barbara,,"Police Station, 601 Santa Barbara Street",MND,5/13/2022,,"The project consists of demolition of an existing parking lot and construction of a new three-story, approximately 53-foot-high, approximately 64,000-square-foot Police Station building, and associated 37.5-foot-high, approximately 84,000-square-foot parking structure to accommodate 236 parking spaces (128 for Police Department fleet vehicles and 108 for employee vehicles). Each structure would also have a subterranean level. Emergency service antennas would be installed on the roof of the parking structure. Eight additional vehicle surface parking spaces and four bicycle parking spaces would be provided for visitors. Grading includes 22,000 cubic yards of export. A total of 23 Tipuana tipu trees and 12 oak trees would be removed; 9 Tipuana tipu trees would be protected. The existing MTD bus stop shelter on Cota Street would be relocated along Cota Street. The existing plaques commemorating the old Lincoln School would also be relocated and incorporated into the project. The project requires Height Exception and Development Plan approvals by the Planning Commission and Project Design and Final approvals by the Architectural Board of Review. The parcel has a zoning designation of MC (Manufacturing Commercial) and a General Plan Designation: of Commercial Industrial/ Medium High Density Residential/ Priority Housing Overlay (37-63 du/ac).",https://ceqanet.opr.ca.gov/2022050302,"Police Station, 601 Santa Barbara St.",Kathleen Kennedy,City of Santa Barbara,Project Planner,KKennedy@SantaBarbaraCA.gov,630 Garden Street,,Santa Barbara,CA,93101,8055645470 ext. 4560,34°25'12"N 119°41'45.6"W,Santa Barbara,Santa Barbara,,Santa Barbara Street/ East Cota Street,93101,1.61,031-151-018,US 101,,,No,5/13/2022,6/13/2022,Other,"Redevelopment, Site Plan, Use Permit","Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire",5/13/2022,6/12/2022,,,,,,,,,,,,,,,