SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022040573,"San Bernardino, City of",City of San Bernardino,,SBMWD Water Facilities Relocation Project,MND,4/27/2022,,"The San Bernardino Municipal Water Department (SBMWD) seeks to develop a new Administrative Building within a site containing the SBMWD existing concrete block operations buildings. The proposed SBMWD Water Facilities Relocation Project consists of development within a 7.86 acre or 342,426.48 square foot (SF) site designated for Industrial use by the City of San Bernardino General Plan on the southeast corner of South E Street and Chandler Place in southwestern San Bernardino. The project consists of one parcel with the following Assessor’s Parcel Number (APN): 0141-291-07. The project proposes a new administration building that will incorporate sustainable, energy efficient building systems and features, including a 17,921 SF demonstration garden. The proposed project would also include renovations of the existing 26,055.6 SF concrete block operations building that is located toward the eastern boundary of the site, which will house vehicle maintenance in the existing service bays and administrative offices in the two-story office section of the building. Additionally, the project includes the development of a 13,500 SF one-story tilt-up concrete warehouse with loading docks, as well as other site improvements. Construction of the proposed SBMWD Water Facilities Relocation Project is anticipated to be completed in three phases to be completed in about 24 months. Once in operation, the Administrative Headquarters will operate between the hours of 6:00 a.m. and 6:00 p.m., except in the event of an emergency. ",https://ceqanet.opr.ca.gov/2022040573,SBMWD Water Facilities Relocation Project,Travis Martin,City of San Bernardino,Associate Planner,Martin_Tr@sbcity.org,"201 North ""E"" Street, 3rd Floor",,San Bernardino,CA,92401,9093845313,34°4'37.04"N 117°17'33.5"W,San Bernardino,San Bernardino,,Chandler Place and E Street,92408,7.86,0141-291-07,10 and 215,Santa Ana River,San Bernardino Int'l Airport,No,,,Office,Site Plan,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire",4/29/2022,5/18/2022,,,,,,,,,,,,,,,