SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022040185,"Fish and Wildlife, Region 6 - Inland Deserts, Ontario","California Department of Fish and Wildlife, Inland Deserts Region 6 ",CDFW,ETS 46898 – L235 CP DIGS NEWBERRY SPRINGS (Lake or Streambed Alteration Agreement EPIMS No. SBR-16113),NOE,4/8/2022,4/8/2022,"The California Department of Fish and Wildlife (CDFW) has executed Lake or Streambed Alteration Agreement number EPIMS-SBR-16113-R6 pursuant to Section 1602 of the Fish and Game Code to Southern California Gas Company (SoCalGas). The project is limited to excavation of two sections of existing pipeline L235 at MP127.93 and MP124.56 for the purpose of recoating deteriorating sections of the pipeline. A 300ft x 50ft work area to recoat a 200 ft section of pipeline and a 400ft x 50ft work area to recoat a 300 ft section of pipeline, is required by code. Project crews will first grade the work area, next a backhoe excavator will be used to dig a 4 ft deep by 10 ft wide trench on both sides of the pipeline. Crews will then access the trench to sandblast and recoat the exposed pipeline using hand tools. Once the pipeline has been recoated the crews will backfill the trench using previously excavated soils and re-contour the work site to pre-project grades.",https://ceqanet.opr.ca.gov/2022040185,ETS 46898 – L235 CP DIGS NEWBERRY SPRINGS (Lake or Streambed Alteration Agreement EPIMS No. SBR-16113),Julia Karo,"Fish and Wildlife, Region 6",Environmental Scientist ,Julia.Karo@wildlife.ca.gov,3602 Inland Empire Blvd.,Suite C-220,Ontario,CA,91764,9092782950,34°46'20.7"N 116°36'26.3"W,,San Bernardino,San Bernardino,,,,,,,,,,,,,,,,Categorical Exemption,"Type – Class 1; California Code of Regulations, title 14, section (15301) Type - Class 4; California Code of Regulations","This proposed Project is limited to the inspection and operation of existing public structures, facilities, mechanical equipment, or topographical features.",,,,,,,,,,,,