SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022040075,"San Jose, City of",City of San Jose,,San José-Santa Clara Regional Wastewater Facility Storm Drain System Improvement Project,NOE,4/5/2022,4/5/2022,"A San José-Santa Clara Regional Wastewater Facility (Facility) project to conduct storm drainage and sanitary sewer infrastructure improvements within the 196-gross acre Main Operational Area of the Facility, including, but not limited to pipeline unclogging and/or replacement, storm drain inlet improvements, and Facility tunnel entrance waterproofing. Additional improvements both within and outside of the Main Operational Area to stormwater pump stations and associated infrastructure including, but not be limited to replacement and upsizing of stormwater pumps, replacement of three stormwater pump stations, inlet ditch upgrades, new lighting, restoration of walking surfaces and replacement of electrical cable to pump stations where needed. Approximately 2,800 feet of stormwater pipes would be replaced and approximately 5,500 feet of stormwater pipelines would be inspected, flushed, and cleaned. Approximately 1,000 feet of sanitary sewer pipelines would be replaced, while approximately 1,700 feet of sewer pipelines would be inspected, flushed, and cleaned. Approximately 6,000 sq. ft. of ground disturbance will result from storm drain and sanitary sewer pipeline replacement; less than 0.14-acres of ground will be disturbed.",https://ceqanet.opr.ca.gov/2022040075,San José-Santa Clara Regional Wastewater Facility Storm Drain System Improvement Project,Cort Hitchens,City of San José,Planner,cort.hitchens@sanjoseca.gov,200 E. Santa Clara Street,,San José,CA,95113,4087947386,,San Jose,Santa Clara,Santa Clara,,95002,,"015-31-024 015-31-044, 015-30-070, 015-38-005, 015-31-051, 015-31-008, 015-30-098, and 015-31-00",,,,,,,,,,,,Statutory Exemption,Section 15269(b),"The Storm Drain Systems Improvements Project would include the maintenance, repairs, and replacement of stormwater and sanitary sewer infrastructure as discussed above. The Project activities are necessary to avoid emergency disruptions of critical Facility operations during large storm events that can cause massive flooding. Historically, the Facility experienced two 10-year, El Niño winter storm events in 1982 and 2014 that resulted in mass flooding, compromising essential operations, such as access and safety. Damage and defects to the stormwater and sanitary sewer system, caused by devaluation due to use, will likely fail within the next five to 10 years and would not be readily available to function in the next 10-year storm event, and therefore, disruptions to critical Facility operations would be imminent. The Storm Drain Systems Improvements Project would prevent safety and access concerns in order to maintain services essential to the public health, safety, and welfare of approximately two million people that the Facility serves. Moreover, the Project is anticipated to be completed at a reasonable timeline within the next two years. Project design was completed in mid-2021, while the Project would begin construction in the first half of 2022 and complete construction near the end of 2023. For these reasons, the Project as described in this document qualifies for a statutory exemption under CEQA Guidelines Sections 15269(b) from the environmental review requirements of Title 21 of the San José Municipal Code, implementing the California Environmental Quality Act of 1970, as amended.",,,,,,,,,,,,