SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022030510,"Toxic Substances Control, Department of",Department of Toxic Substances Control,,Carmel Cleaners Removal Action Workplan,NOE,3/18/2022,3/18/2022,The project involves approval of a Removal Action Workplan (RAW) for the construction of a soil vapor extraction (SVE) system for soil vapor that is impacted with volatile organic compounds (VOCs) at the Carmel Cleaners (Site). This removal action would reduce the human health-based risk associated with the potential for soil vapor migrating into indoor air to a value that would protect human health and the environment. Operation of the SVE system will also help contain the soil gas in the short term while eliminating the contamination over the longer term.,https://ceqanet.opr.ca.gov/2022030510,Carmel Cleaners Removal Action Workplan,Jayantha Randeni,Department of Toxic Substances Control,Senior Hazardous Substances Engineer,jayantha.randeni@dtsc.ca.gov,700 Heinz Avenue,,Berkeley,CA,94710,5105403806,,Carmel-by-the-Sea,Monterey,Monterey,Junipero Street and 3rd Avenue,,,,,,,,,,,,,,,Other,Common Sense,"DTSC has determined with certainty that there is no possibility that the activities in question may have a significant effect on the existing environment because the project would not result in ""a substantial, or potentially substantial, adverse change in any of the physical conditions within the area affected by the project, including land, air, water, minerals, flora, fauna, ambient noise, and objects of historic or aesthetic significance.” The site is in a previously developed area and does not provide habitat value. The project is consistent with applicable state and local environmental permitting requirements including, but not limited to, air quality rules such as those governing VOC emissions and approved by the regulatory body with jurisdiction over the site (e.g., City of Carmel, MBARD). The installation of the SVE system has already been completed for the pilot study and, therefore, approval of the RAW will not result in any expansion of the existing SVE. In addition, permits from MBARD have been obtained for the existing SVE system. For these reasons, the remediation activities described in the RAW would not have the potential to negatively impact adjacent or nearby receptors, which include hotel and commercial land uses.",,,,,,,,,,,,