SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022030175,"Regional Water Quality Control Board, Region 6 - South Lake Tahoe","California Regional Water Quality Control Board, Lahontan South Lake Tahoe Region 6 ",RWQCB,Stock-Johannessen Pier Construction Project,NOE,3/4/2022,3/4/2022,"The purpose of the Project is to construct a new pier with a boat lift and adjustable catwalk on the subject property in Lake Tahoe. The proposed pier will be approximately 108 feet long, with a pier head 30 feet in length and 10 feet including a 3-foot adjustable catwalk. Equipment required for pier pile driving activities will be operated from an amphibious barge. Pier construction will be accomplished using equipment staged and/or mounted on an amphibious barge to avoid and minimize potential temporary lakebed disturbance. Caissons will be used during pile installation to minimize potential sediment discharge. The Spill Prevention Plan will avoid potential impacts of petroleum byproducts entering Lake Tahoe. The project will create 6.5 square feet of impacts to Lake Tahoe.",https://ceqanet.opr.ca.gov/2022030175,Stock-Johannessen Pier Construction Project,Adam Henriques,RWQCB,Environmental Scientist,Adam.Henriques@waterboards.ca.gov,2501 LAKE TAHOE BLVD,,SO LAKE TAHOE,CA,96150,5305425439,,,Placer,Placer,5568 North Lake Blvd,96140,,,,,,,,,,,,,,Categorical Exemption,15304,"The RWQCB, Lahontan Region finds that this project, as permitted, will not have a significant effect on the environment and shall, therefore, be exempt from the provisions of the California Environmental Quality Act (CEQA) pursuant to Section 15304, Minor Alterations to Land. ",,,,,,,,,,,,