SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022020590,"Roseville, City of",City of Roseville,,Kaiser Permanente Roseville Medical Center Inpatient Bed Tower,NOP,2/25/2022,,"The proposed project would increase the size and capacity of the previously approved 2004 Expansion Project. Specifically, the proposed project revises the 2004 Expansion Project to allow for an approximately 278,000 square-foot, six-story, 138-bed Inpatient Tower building (on the site of the prior approved Surgery and Intensive Care Unit Facility); a relocation of the northwest corner loop road; and a new four-level garage with rooftop parking to accommodate approximately 800 stalls located in the northeast corner of the campus (on the site of the prior approved parking garage); a new main hospital entrance and drop off area; expansion of the existing Emergency Department to add 36 new treatment bays; and a new generator yard and internal upgrades to the existing Central Utility Plant (CUP). The proposed project would be constructed on portions of the property currently occupied by surface parking lots. The project entitlements include a Major Project Permit Stage 1 Modification and Stage 2; an Amendment to the Development Agreement by and between the City of Roseville and Kaiser Foundation Hospitals to address the increased use intensity and vested entitlements; and a Specific Plan Amendment (text only) to the Northeast Roseville Specific Plan to modify the minimum setback requirements for any building three (3) stories or more in height.",https://ceqanet.opr.ca.gov/2022020590,Kaiser Permanente Roseville Medical Center Inpatient Bed Tower,Kinarik Shallow,City of Roseville,Associate Planner,kshallow@roseville.ca.us,311 Vernon Street,,Roseville,CA,95678,9167461309,,Roseville,Placer,,,95661,49.18,048-012-001,Interstate 80,,,Yes,2/25/2022,3/28/2022,"Commercial, Other",Site Plan,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire",2/25/2022,3/28/2022,,,,,,,,,,,,,,,