SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022020416,"Long Beach, City of",City of Long Beach,,Fire Station No. 9 at 4101 Long Beach Boulevard,FIN,9/21/2022,,"The City of Long Beach (City) is the Lead Agency responsible for preparing this Initial Study (IS) evaluating potential environmental impacts associated with the demolition of an existing 5,000 square foot office building on-site and the development of a 12,780 sf fire station and associated landscaping and parking. The proposed project would be located at 4101 Long Beach Boulevard on a 0.4-acre project site. The proposed Fire Station No. 9 would provide fire services to the Fire Station No. 9 service area. Infrastructure improvements necessary to facilitate pedestrian and vehicular access to and from the project site, landscaping improvements, and necessary utility upgrades are also included. Off-site improvements would include three new emergency-only traffic signals and the alley on the north border of the project site would be widened by approximately 2.5 ft. The proposed project requires the following discretionary actions: certification of the EIR, site plan review, standard variance, general plan amendment, zone amendment, and a lot merger. The project site is comprised of two Assessor’s Parcel Numbers [APNs]: 7139-015-017 and 7139-015-01. The Project Site is surrounded by single-family residential uses to the northwest and west, a coffee shop and retail stores directly to the north, multi-family residential uses and office uses to the east across Long Beach Boulevard, and office uses to the south.",https://ceqanet.opr.ca.gov/2022020416/3,Fire Station No. 9 at 4101 Long Beach Boulevard,Maryanne Cronin,City of Long Beach,Planner,maryanne.cronin@longbeach.gov,"411 W. Ocean Blvd, 3rd Floor",,Long Beach,CA,90802,5625705683,,Long Beach,Los Angeles,,Long Beach Boulevard and East Randolph Place,90807,0.4,7139-015-017 and 7139-015-010,I-405 and I-710,N/A,Long Beach Airport,No,9/21/2022,10/6/2022,Other,"General Plan Amendment, Rezone, Site Plan","Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Economics/Jobs, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems",9/21/2022,10/6/2022,,,,,,,,,,,,,,,