SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022020300,"Caltrans, District 9 - Bishop","California Department of Transportation, District 9",DOT,Freeman Slope Repair Phase 2,NOE,2/14/2022,2/14/2022,Caltrans is proposing a project to repair areas of eroded slopes on the previous Freeman 1 project where heavy rains have caused rills and gullies to form. Rills and gullies will be filled with borrow fill materials. Dry seeding will be applied where slope erosion is evident. Fiber roll or compost sock will be installed along the hinge point of the slope where erosion is evident. It is anticipated that the installation of fiber rolls/compost socks along the hinge point of the slope at the frontage road located near PM 61.3 will require a temporary construction easement. Rock slope protection(RSP) will be constructed in areas where stormwater flow energy needs to be dissipated. The downstream side of the RSP will be located near the inlets of existing drainage systems. The frontage road near Postmile (PM) 61.3 will be used for staging.,https://ceqanet.opr.ca.gov/2022020300,Freeman Slope Repair Phase 2,Kristopher Bason,Caltrans District 9,Associate Environmental Planner,kristopher.bason@dot.ca.gov,500 South Main St.,,Bishop,CA,93514,7607844056,,,Kern,Kern,,,,,14,,,,,,,,,,,Categorical Exemption,15301. Class 1 (h),After a review of the project and location it has been determined that no known environmental resources will be impacted by this project.,,,,,,,,,,,,