SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022010449,Los Angeles Department of Water and Power,,,Los Angeles Reservoir Outlet Pipe Relining Project,NOE,1/25/2022,1/25/2022,"LADWP proposes to replace the Los Angeles Reservoir (LAR) Outlet Pipe Lining (proposed Project) to address reliability issues caused by aging infrastructure. This Project is in response to two inspections indicating that the Cement Mortar Lining (CML) is reaching the end of its useful life. The proposed project will remove the existing 3/4-inch thick CML and reline the 120-inch diameter welded steel LAR Outlet Pipeline with polyurethane for approximately 1000 feet towards the Los Angeles Reservoir Ultraviolet Disinfection Treatment Plant. The proposed CML removal and relining work will be completed within 30 calendar days once started and occur during the period of low water demand between November and February. All work will occur within the underground Outlet Pipe. The proposed Project is expected to occur between November 2023- February 2026, with project timing reliant on Water Distribution’s ability to deactivate the LAR Outlet Pipe.",https://ceqanet.opr.ca.gov/2022010449,Los Angeles Reservoir Outlet Pipe Relining Project,Marshall Styers,Los Angeles Department of Power and Water,Environmental Specialist,marshall.styers@ladwp.com,111 N. Hope St,Room 1044,Los Angeles,CA,90012,2133673541,34°17'40.7"N 118°28'36.4"W,Los Angeles,Los Angeles,Los Angeles,N Sepulveda Blvd and Roxford St,91345,"1,000 Linear Ft",,"I-5, I-405, I-210, SR 118",,,,,,,,,,,Categorical Exemption,"Section 15302, Class 2","In accordance with the California Environmental Quality Act, this project is Categorically Exempt from CEQA review pursuant to Section 15302, Class 2, which consists of replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced, including but not limited to: (c) Replacement or reconstruction of existing utility systems and/or facilities involving negligible or no expansion of capacity. The proposed project meets the requirements of these exemptions; therefore, no further CEQA review is required.",,,,,,,,,,,,