SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022010311,Reclamation District 348,,,South Mokelumne River Setback Levee Project,MND,1/20/2022,,"Portions of the New Hope Tract levee system, along the South Mokelumne River, are below the Delta Specific PL 84-99 Standard, which requires 1.5 feet of freeboard above the 100-year flood elevation, waterside slopes at a minimum of 2:1 and landside slopes at a minimum of 3:1. The purpose of the South Mokelumne River Setback Levee Project is to rehabilitate 3 levee sections, totaling 4,350 LF, and to create waterside habitat. Landside work includes constructing setback levees to the Delta Specific PL 84-99 Standard. Aggregate base material will be placed on the setback levee crown to create an all-weather roadway. Waterside work includes excavation of the existing levee above Mean Lower Low Water (MLLW) to construct a habitat bench. The habitat benches and setback levee waterside slopes will be planted with native species. Plantings will be monitored and maintained for 3 years to ensure success criteria is met.",https://ceqanet.opr.ca.gov/2022010311,South Mokelumne River Setback Levee Project,Patrick Ervin,"Wagner & Bonsignore, Consulting Civil Engineers",Project Engineer,pwervin@wbecorp.com,2151 River Plaza Drive,Suite 100,Sacramento,CA,95833,9164416850,38°12'17.66"N 121°28'43.51"W,,San Joaquin,,North Lamb Road and West Walnut Grove Road,95242,16,"001-050-100, -250, -280",,South Mokelumne River,,Yes,1/20/2022,2/22/2022,Other,,"Biological Resources, Cultural Resources, Hydrology/Water Quality",1/20/2022,2/22/2022,,,,,,,,,,,,,,,