SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2022010244,East Bay Regional Parks District,,,Robert Crown Memorial State Beach - Renovate McKay Avenue Utilities,NOE,1/18/2022,1/18/2022,"East Bay Regional Park District (EBRPD) proposes to replace and install 5 new sanitary sewer system (SS) manholes, 800’+/- new gravity line, a new lift station, 800’+/- new SS force main and 2300’+/- new potable water line. Renovate sanitary sewer system, and separate EBRPD sanitary sewer from the adjacent Wellness Center property. Work to include the following: • Remove or abandon-in-place brick manholes and clay tile gravity sewer piping serving EBRPD facilities at McKay Avenue. Install new manholes and gravity piping as required. • Demolish EBRPD SS lift station located adjacent to the Crab Cove Visitor Center parking lot. • Install new SS lift station after demolition of adjacent existing SS lift station. Install new SS force main pipe to existing City manhole at Central Avenue. EBRPD effluent will no longer flow into the Wellness Center SS lift station located near the north end of McKay Avenue. Other sanitary sewer improvements include replacing a portion of the gravity piping and adding a new manhole at Memory Lane. Separate EBRPD potable water system from the adjacent Wellness Center property and improve flow at the Crab Cove Visitor Center. Work to include the following: • Install new potable water line from the Park main at the habitat garden near Westline Drive to the Glory of the Seas and Crab Cove Visitor Center buildings. Remove or abandon-in-place potable water piping supplying EBRPD facilities from the Wellness Center system. All potable water will be supplied to existing park facilities through the existing EBMUD water meter on Westline Drive.",https://ceqanet.opr.ca.gov/2022010244,Robert Crown Memorial State Beach - Renovate McKay Avenue Utilities,Tonya Covarrubias,East Bay Regional Park District,Planner,tcovarrubias@ebparks.org,2950 Peralta Oaks Court,,Oakland ,CA,94605,5105442326,,Alameda,Alameda,Alameda,Central Avenue,94501,,,I-880,,,,,,,,,,,Categorical Exemption,Section 15301 (b) (d),"This project will include replacement and renovation of existing deteriorated and aged sanitary sewer system, separate EBRPD sanitary sewer and potable water system from the adjacent property to improve flow at EBRPD facilities and meet current standards of public health and safety.",,,,,,,,,,,,