SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2021120291,Tuolumne County,,,WWTP Pond One Liner Replacement Project,NOE,12/14/2021,12/14/2021,"The Groveland CSD (GCSD) Reservoir 1 is lined with a thin geomembrane liner. The liner has failed and is in need of replacement. The proposed project includes the replacement of the existing geomembrane liner, as well as various site improvements such as the addition of new drainage facilities adjacent to the pond to divert runoff from entering the reservoir, fencing around the perimeter of the reservoir and the construction of a concrete solids drying pad.",https://ceqanet.opr.ca.gov/2021120291,WWTP Pond One Liner Replacement Project,Peter Kampa,Groveland CSD,General Manager,pkampa@gcsd.org,18966 Ferretti Road,,Groveland,CA,95321,2099627161,,Sonora,Tuolumne,Tuolumne,,95321,,,,,,,,,,,,,,Categorical Exemption,Class 1 - Existing Facilities (S. 15301),Project consists of replacing the existing geomembrane liner and various site improvements to improve the operation of Reservoir 1. The proposed improvements involve no expansion.,,,,,,,,,,,,